Lane closures scheduled for East River Road Bridge over I-90
![traffic-watch.jpg](https://images.foxtv.com/static.fox32chicago.com/www.fox32chicago.com/content/uploads/2019/08/764/432/051ec75e-4478854_G_1439326067913_87470_ver1.0_640_360.jpg?ve=1&tl=1)
CHICAGO (STMW) - Temporary lane closures on the East River Road Bridge over I-90 began earlier this month for bridge reconstruction pre-stage work.
Intermittent, temporary lane closures on East River Road over I-90 and overnight lane and shoulder closures on I-90 at East River Road began Feb. 8. The bridge will be completely closed down in spring 2016, according to a statement from the Illinois Department of Transportation.
Drivers can expect delays and should allow extra time for trips through this area.